SUSTAINABLE TRANSPORT ongoing completed INFRASTRUCTURE CONNECTIVITY TRANSPORT REFORM MEASURES Implementation Support to Establish Rail Passenger Operations in Albania Feasibility Study and Detailed Design for the Modernisation of Priority Green Lanes Border Crossing Points in the Western Balkans Technical Assistance for the preparation of due diligence of detailed design and cost estimate and gap analysis of the existing feasibility study, ESIA and design for Foca-Hum in BiH Development of the project for the reconstruction of the Electric Traction Substation (ETS) Nis and the connecting transmission line from ETS Nis to the railway line Tirana Bypass: South Section (Vaqarr – Farke) Technical Assistance to the Reconstruction and Modernisation of railway line Valjevo – Vrbnica – state border, Section: Valjevo – Pozega CONNECTIVITY TRANSPORT REFORM MEASURES Feasibility Study and Detailed Design for the Modernisation of Priority Green Lanes Border Crossing Points in the Western Balkans Who is eligible for CONNECTA 2 assistance and how to apply LEARN MORE